色多多www-乳色吐息在线观看-国产精品天干天干在线播放-国产福利不卡视频在免费播放-明星ai换脸一区二区三区-国产片av在线永久免费观看-国产高清对白探花-亚洲一级精品视频-性中国videosfree另类,日本多毛老太,aaaaa级少妇高潮大片免费看,亚洲人成电影在线观看网色

歡迎訪問(wèn)永誠(chéng)廣建公路材料(山東)有限公司網(wǎng)站!

永誠(chéng)廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 公司新聞

公司新聞

瀝青混合料的攤鋪施工技術(shù)要求

來(lái)源:http://www.tainorosa.com/ 日期:2023-11-13
1.待攤鋪機(jī)前的運(yùn)料車不少于5輛方可開(kāi)始攤鋪混合料,避免停機(jī)待料,保持?jǐn)備佭B續(xù)。
1. There should be no less than 5 transport trucks in front of the paver before starting to pave the mixture, to avoid stopping and waiting for the material, and to maintain continuous paving.
2.當(dāng)有大功率攤鋪機(jī)時(shí),可采用單機(jī)全斷面攤鋪,并通過(guò)試驗(yàn)段比較來(lái)確定采用單機(jī)還是雙機(jī)方案。不論采用何種攤鋪方案,都應(yīng)配備一臺(tái)可自動(dòng)伸縮以調(diào)整寬度的攤鋪機(jī)。
When there is a high-power paver, a single machine full section paving can be used, and the single machine or dual machine scheme can be determined through comparison of experimental sections. Regardless of the paving scheme used, a paving machine that can automatically retract and adjust the width should be equipped.
3.當(dāng)采用3層瀝青結(jié)構(gòu)層時(shí),攤鋪下層時(shí)不論是否分層施工,均應(yīng)采用掛線法施工,中、上層宜采用非接觸平衡梁或浮動(dòng)基準(zhǔn)梁裝置施工,但在橋頭過(guò)渡段中層仍應(yīng)采用掛線法施工。
When using a 3-layer asphalt structure layer, the lower layer should be constructed using the hanging line method regardless of whether it is constructed in layers. The middle and upper layers should be constructed using non-contact balanced beams or floating reference beam devices, but the hanging line method should still be used for construction in the middle layer of the bridge head transition section.
4.當(dāng)采用雙機(jī)聯(lián)合攤鋪3層瀝青混合料結(jié)構(gòu)層時(shí),下、中層兩幅搭接位置宜避開(kāi)車道輪跡帶,前后兩臺(tái)攤鋪機(jī)軌道重疊30~60mm,中、上層搭接位置宜錯(cuò)開(kāi)200mm以上,兩臺(tái)攤鋪機(jī)前后的距離一般為10~20m以確?;旌狭喜话l(fā)生離析,且縱向接縫為熱接縫。表面層縱向接縫位置應(yīng)位于標(biāo)線處,其余各層應(yīng)分別緊挨路面標(biāo)線兩側(cè)。各層攤鋪后應(yīng)人工配合拍邊,使邊緣整齊、密實(shí)。
濟(jì)南瀝青混凝土
When using a dual machine joint paving of a 3-layer asphalt mixture structural layer, the overlapping positions of the lower and middle layers should avoid the lane wheel track. The tracks of the front and rear pavers should overlap by 30-60mm, and the overlapping positions of the middle and upper layers should be staggered by more than 200mm. The distance between the front and rear of the two pavers is generally 10-20m to ensure that the mixture does not segregate, and the longitudinal joint is a hot joint. The longitudinal joints of the surface layer should be located at the markings, and the remaining layers should be adjacent to both sides of the road markings. After each layer is paved, manual cooperation and edge tapping should be carried out to make the edges neat and dense.
5.攤鋪機(jī)開(kāi)工前應(yīng)提前0.5~1h預(yù)熱熨平板不低于120℃。鋪筑過(guò)程中應(yīng)選擇熨平板的振搗或夯錘壓實(shí)裝置具有適宜的振動(dòng)頻率和振幅,以提高路面的初始?jí)簩?shí)度。熨平板加寬連接應(yīng)仔細(xì)調(diào)節(jié)至攤鋪的混合料沒(méi)有明顯的離析痕跡。
5. Before starting the paver, the preheating of the ironing plate should be 0.5 to 1 hour in advance, and the temperature should not be lower than 120 ℃. During the paving process, the vibrating or ramming device of the screed should be selected with appropriate vibration frequency and amplitude to improve the initial compaction of the road surface. The widening connection of the ironing plate should be carefully adjusted until there are no obvious signs of segregation in the paved mixture.
6.攤鋪機(jī)的螺旋布料器應(yīng)相應(yīng)于攤鋪速度調(diào)整到保持一個(gè)穩(wěn)定的速度均衡地轉(zhuǎn)動(dòng),兩側(cè)應(yīng)保持不少于送料器2/3高度的混合料,以減少在攤鋪過(guò)程中混合料的離析。
6. The spiral distributor of the paver should be adjusted to maintain a stable and balanced rotation speed corresponding to the paving speed, and the mixture should be kept at a height of no less than 2/3 of the feeder on both sides to reduce the segregation of the mixture during the paving process.
7.熱拌瀝青混合料的低攤鋪溫度根據(jù)鋪筑層厚度、氣溫、風(fēng)速及下臥層表面溫度按《公路瀝青路面施工技術(shù)規(guī)范》(JTGF40-2004)5.2.2條執(zhí)行,且不得低于規(guī)范表的要求。
7. The low paving temperature of hot mix asphalt mixture shall be in accordance with Article 5.2.2 of the Technical Specification for Construction of Highway Asphalt Pavements (JTGF40-2004) based on the thickness of the paving layer, temperature, wind speed, and surface temperature of the underlying layer, and shall not be lower than the requirements of the specification table.
8.瀝青混合料的攤鋪速度控制在2~6m/min為宜,上面層攤鋪速度不應(yīng)超過(guò)5m/min,其攤鋪用料量應(yīng)和拌合機(jī)的產(chǎn)量相適應(yīng)。
8. The paving speed of asphalt mixture should be controlled between 2-6m/min, and the paving speed of the upper layer should not exceed 5m/min. The amount of material used for paving should be suitable for the output of the mixer.
9.移動(dòng)路脊法一般在上面層實(shí)施,具體施工方法如下:
9. The mobile ridge method is generally implemented on the upper layer, and the specific construction methods are as follows:
(1)采用移動(dòng)路脊法施工的路段長(zhǎng)度和路脊橫坡應(yīng)嚴(yán)格遵照設(shè)計(jì)實(shí)施。
(1) The length and cross slope of the road section constructed using the mobile ridge method should strictly follow the design implementation.
(2)根據(jù)采用移動(dòng)路脊法的施工路段長(zhǎng)度,在路段的起始端兩側(cè)取對(duì)角線,劃分兩個(gè)板塊施工,圖示如下:
(2) According to the length of the construction section using the moving ridge method, diagonal lines are taken on both sides of the starting end of the section, and construction is divided into two sections, as shown in the figure below:
(3)施工機(jī)械選擇及工藝
(3) Selection and process of construction machinery
應(yīng)采用可自動(dòng)調(diào)節(jié)寬度的攤鋪機(jī)并輔以人工配合進(jìn)行攤鋪和修整。第一板塊施工時(shí),攤鋪機(jī)根據(jù)路面寬度,采用不同寬度多幅攤鋪,每幅鋪筑均采用掛線法控制標(biāo)高,每幅按劃分的攤鋪寬度鋪至對(duì)角線時(shí)開(kāi)始自動(dòng)調(diào)縮攤鋪寬度,直至按攤鋪機(jī)小攤鋪寬度鋪完本幅,再另起一幅攤鋪,直至鋪完第一板塊,然后迅速以人工將對(duì)角線以外的多預(yù)料鏟除,并保證對(duì)角線順直。第二板塊也采用多幅鋪筑,攤鋪機(jī)不足部分由人工補(bǔ)齊。
A paver with automatic width adjustment and manual coordination should be used for paving and trimming. During the construction of the first section, the paver uses multiple pavers of different widths based on the width of the road surface. Each paver uses the hanging line method to control the elevation. When each paver is laid to the diagonal according to the divided paving width, the paving width automatically decreases until the small paving width of the paver is completed. Then, another paver is started until the first section is completed. Then, manually remove any unexpected areas outside the diagonal and ensure that the diagonal is straight. The second section also adopts multiple paving methods, and the insufficient parts of the paver are manually supplemented.
10.在路面狹窄部分、平曲線半徑過(guò)小的匝道、加寬部分、斜交橋頭等不能采用攤鋪機(jī)的部位可用人工攤鋪混合料。人工攤鋪應(yīng)嚴(yán)格控制操作時(shí)間、松鋪厚度、平整度等。
10. In areas where pavers cannot be used, such as narrow road surfaces, ramps with small flat curve radii, widened areas, and oblique bridge heads, manual paving of the mixture can be used. Manual paving should strictly control the operation time, loose paving thickness, flatness, etc.
11.嚴(yán)格按照設(shè)計(jì)銜接路面結(jié)構(gòu)層和橋隧過(guò)渡板(如下圖所示),并至少提前一天準(zhǔn)備好工作面,處理好欠壓實(shí)、松散、不平整等問(wèn)題,并掃除松散材料和所有雜物。監(jiān)理工程師應(yīng)對(duì)此檢查驗(yàn)收。
11. Strictly follow the design to connect the pavement structure layer and bridge tunnel transition plate (as shown in the figure below), and prepare the working surface at least one day in advance to handle issues such as undercompaction, looseness, and unevenness, and remove loose materials and all debris. The supervising engineer shall inspect and accept this.
  • 上一條:濟(jì)南壓路機(jī)租賃:壓路機(jī)的分類
  • 下一條:濟(jì)南壓路機(jī)出租:壓路機(jī)有哪幾種?怎么分類?
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    **2022在线观看-国产成人综合视频 国产伦精品一区二区三区视频网站-男女爽插视频-高清免费播放 欧美激性欧美激情在线 | 人妻中文字幕在线-小妖精又紧又湿h高潮视频69-精品一区二区三区日韩-色老太婆太紧了A片 | gogogo手机完整版在线-juzz日本-人人爽人人爱-日日日伊人尤物 | 江苏少妇性BBB搡BBB爽爽爽-亚洲一区二区三区福利视频网址-亚洲AV成人高清无码瑜伽-侵犯上司一区二区三区 | 办公室大乳奶AV一区二区三区-黄色伊人-六婷婷操-大香蕉狼人综合伊人免费在线 | 性中国熟妇videofreesexwww-东北高大丰满BBBBzBBB-zuanshih.com高价收liang,请涟系@qdd2000-真人实拍999 | 探花老熟女-大奶子导航-亚洲夜夜草-精品一区二区不卡毛片啪 | 国产精品 巨乳系列 逍遥阁-国产真人一级a爱做片r让您可以享受他们更大的语言刺激。-仙踪林国精产品视频-美女下面小穴线观看 | 在线极品白嫩美女被干-有码在线观看www-成年女人裸体自慰全过程免费-东北熟女露脸对白 | 中国老啊姨一级毛片黄片-小草社区影视日本-日本人妻av无码一区二区电影-国产av夜色一区二区三区 免费无码专区高潮流白浆-搡老熟女 中国老太婆了-搡老女人老妇女老妇老熟女-日本边做边吃奶aⅴ视频免费 | 真实 交ⅴideos-久久人妻内射无码一区三区-东北妇女不戴套自拍-篠原いよAV资源在线播放 | 昭和军人侵犯妇女电影在线看-1080高清迅雷在线观看 一级黄色片网站-日本强伦姧人妻一区二区 精品国产第一国产综合精品-思思99re视频在线观看 | 老熟女h∪-女人下面流白浆的视频-日本偷窥熟妇人妻-北条麻妃制服丝袜在线播放 | 部精品久久久久久久久-初撮五十路熟女人妻论坛-日韩毛片-国产欧美一二三区 | 欧美成人VA网站两男一女-欧美另类人与兽-美女裸体小鸡哈尿视频网站-黑人巨根亚洲 | 大香蕉狠狠干狠狠爱-chinese真实伦对白露脸-处一女一级a一片av-成人精品3d蒂法动漫041-偷尝新婚小少妇-日韩毛片AV | 蓝光电影在线观看 漂亮人妻被夫上司强了波多野结衣-大美女靠逼免费-色欲插插-剧情片在线视频观看 国产99在线播放免费 | 日韩福利片午夜在线观看-一乃葵在线-艳妇系列短篇500肥岳-九九九综合视频 | 欧美狠狠爱-1080P神马影院在线 91精品国产综合久久香蕉蜜桃-jizz在线观看视频-国产乱人伦精品一区二区在线观看 | 部精品久久久久久久久-初撮五十路熟女人妻论坛-日韩毛片-国产欧美一二三区 | 免费一区二区三区视频导航,河野麻奈-精品在线偷自拍-国产精品白丝喷水在线观看者相-嚕嚕在线看看 | 黄色免费在线观看的在线直播平台-下载器增强软件-九色自拍视频-伊人电影院av | 成人免费a级毛片无码片-欧美成人zz人人澡人人妻-国产伦精品一区二区三区视频网站-欧美色图一区二区 | 五月婷婷导航-啊…深山老汉H脔死我了小说-999免费逼-亚洲色图汇聚全球 | 熟女人妻逍遥区-中文在线几区-国产一级婬片a视频免费观看-色悠悠录像 | 国产探花影视-老司机亚洲精品影院在线-日韩无码 中文字幕av无码-明星裸体一区二区三区 | 娇小未成女A片-性――交――性――乱老女人-久操影视-好男人在线观看免费高清2019 | 绯色av.net-按摩BBWBBWBBW视频-一区二区不卡免费视频-亚洲乱性视频 | 国产一区二区在线-欧美高清性xxxx hdvideo-China国产XXXXXDH-日韩人妻被粗大爽 | 精品亚洲污羞羞片网站-xxxxbbbbb-五十路で初撮り老熟妇-亚洲国产成人久久精品软件 | MM美女亚欧视频免费观看-高傲仙子丝袜美腿呻吟-91jiujiuse-国产在线视精品在亚洲 | 大香蕉伊人xxx-北条麻妃AAAAA片-日韩丰满漂亮女人视频在线观看-日本乱人伦中文字幕网站 | 他揉捏她两乳不停呻吟动态图-国产精品黄片影院久久久久久久-亚洲中文精品视频在线-免费日韩在线视频 | 欧美xxxxx18,jizz26,porntube8-www.黄成人高清-69国产超薄肉色丝袜交足-男插女轻轻影院 | 涩涩视频不卡-亚洲黄色网站在线观看-BD韩语日韩电影在线 啊宝贝我想听你叫视频-gay片网站 三级片无码 | 中文字幕av无码专区第一页-Free性丰满69性欧美天美-成人天堂av在线观看-jizzjizz日本人 | 被继夫添乳尖HD-国产精品无码av天天爽-全网最色一线毛片-720高清免费观看 女人18片毛片60分 | 国产J8又粗又硬又大又爽漫画-成熟女人毛片-青青伊人加勒比-丝袜中出秘书连裤袜中文字幕 | 口述久久中出-欧美辣图综合网站-特级毛片中国女富婆-av加勒比地狱 | 日韩a高清中文字幕丰满乱子伦无码专区-自慰Asian艳丽少妇pics-久久国产亚洲精品超碰 高清性色生活片老熟女-ten 性亚洲 | 绯色av.net-按摩BBWBBWBBW视频-一区二区不卡免费视频-亚洲乱性视频 |