濟(jì)南瀝青料:瀝青混凝土面層施工方案

來源:http://www.tainorosa.com/ 日期:2025-10-30

  瀝青混凝土分為兩層:50厚中粒式瀝青混凝土AC-20、30厚細(xì)粒式混凝土AC-13。在瀝青拌和站購買瀝青混凝土拌合料,10t自卸汽車運(yùn)輸,采用熱拌、熱鋪的施工方法。瀝青面層施工順序:基層清理→測(cè)量放線→灑透層油→攤鋪機(jī)→汽車運(yùn)輸混合料至施工現(xiàn)場(chǎng)→攤鋪機(jī)攤鋪中粒式瀝青砼→整平碾壓→攤鋪細(xì)粒式瀝青砼→驗(yàn)收→開放交通。

  Asphalt concrete is divided into two layers: 50 thick medium grained asphalt concrete AC-20 and 30 thick fine-grained concrete AC-13. Purchase asphalt concrete mixture at the asphalt mixing plant, transport it by 10t dump truck, and use the construction method of hot mixing and hot laying. The construction sequence of asphalt surface layer: base cleaning → measurement and setting out → spraying of penetrating oil → paving machine → transportation of mixture by truck to the construction site → paving of medium grained asphalt concrete by paving machine → leveling and rolling → paving of fine-grained asphalt concrete → acceptance → opening to traffic.base64_image

  施工要點(diǎn)如下:

  The key points of construction are as follows:

  1、施工準(zhǔn)備

  1. Construction preparation

 ?。?)機(jī)械準(zhǔn)備:路面施工前所有機(jī)械都應(yīng)進(jìn)行試運(yùn)轉(zhuǎn),加足油料,壓路機(jī)還應(yīng)將水箱加滿水,各種機(jī)械在連續(xù)施工一段時(shí)間后,應(yīng)進(jìn)行必要的維修。

  (1) Mechanical preparation: Before road construction, all machinery should undergo a trial run, add sufficient fuel, and the roller should also fill the water tank with water. After continuous construction for a period of time, various machinery should undergo necessary maintenance.

  (2)其他小型工具準(zhǔn)備:主要是耙子、手推車、烙鐵、夯錘、瀝青桶、燃煤等,攤鋪機(jī)專用的測(cè)墩、測(cè)釬、鋼絲繩,掛線用的線軸、緊線器也應(yīng)準(zhǔn)備完畢。

  (2) Preparation of other small tools: mainly rake, handcart, soldering iron, rammer, asphalt bucket, coal, etc. The dedicated measuring pier, measuring rod, steel wire rope for the paver, as well as the wire spool and tensioner for hanging the line should also be prepared.

 ?。?)人員準(zhǔn)備:瀝青路面施工速度較快,施工中需連續(xù)作業(yè)。施工前必須對(duì)所有作業(yè)人員進(jìn)行詳細(xì)的分工,定員定崗,對(duì)每個(gè)崗位的施工人員做好技術(shù)交底,使每個(gè)人都了解自己的工作內(nèi)容,都能緊張有秩序地工作。對(duì)于機(jī)械操作人員,在上崗前要著重進(jìn)行交底,使他們明白操作程序和操作方法,杜絕在現(xiàn)場(chǎng)操作中的隨意性?,F(xiàn)場(chǎng)指揮人員必須頭腦冷靜并具有權(quán)威性,避免多頭指揮,在施工前,現(xiàn)場(chǎng)指揮人員必須確定并給予一定的權(quán)利,在施工中,出現(xiàn)各種情況都應(yīng)通過現(xiàn)場(chǎng)指揮人員進(jìn)行處理,以免造成混亂。

  (3) Personnel preparation: The construction speed of asphalt pavement is fast, and continuous operation is required during construction. Before construction, detailed division of labor must be carried out for all workers, with fixed personnel and positions. Technical instructions must be given to each construction worker in each position, so that everyone understands their work content and can work in a tense and orderly manner. For mechanical operators, it is important to conduct a thorough briefing before starting work to ensure they understand the operating procedures and methods, and to prevent any arbitrariness during on-site operations. On site command personnel must be calm and authoritative, avoiding multiple commands. Before construction, on-site command personnel must determine and give certain rights. During construction, all situations should be handled by on-site command personnel to avoid confusion.

 ?。?)路面基層清理:實(shí)踐證明基層清理工作的好壞對(duì)于瀝青砼與基層粘結(jié)的影響極大,必須清理干凈,不能有絲毫馬虎,清理方法以人工清掃為主,

  (4) Road base cleaning: Practice has proven that the quality of base cleaning work has a great impact on the bonding between asphalt concrete and base. It must be cleaned thoroughly without any carelessness, and the cleaning method is mainly manual cleaning,

  2、施工測(cè)量

  2. Construction surveying

  施工測(cè)量是路面施工技術(shù)中較關(guān)鍵的一環(huán),施工測(cè)量的精度直接影響到攤鋪機(jī)攤鋪質(zhì)量。我們堅(jiān)持“雙控”制度,即經(jīng)理部和作業(yè)隊(duì)兩級(jí)控制,路線中點(diǎn)由導(dǎo)線點(diǎn)用精密測(cè)距儀導(dǎo)入橋梁、涵洞等結(jié)構(gòu)物之上,施工用水準(zhǔn)點(diǎn)均用三等水準(zhǔn)測(cè)量從導(dǎo)線點(diǎn)導(dǎo)入工地永久性電信井、橋梁等結(jié)構(gòu)物上,測(cè)量資料應(yīng)統(tǒng)一計(jì)算,測(cè)放測(cè)墩、測(cè)釬及鋼絲繩的人員應(yīng)固定。攤鋪高程由攤鋪機(jī)傳感器在測(cè)墩或測(cè)釬上拴掛的直徑為2mm的鋼絲繩上拖拉傳感器測(cè)棒進(jìn)行控制。測(cè)墩每10m一個(gè),在曲線半徑較小處和超高處應(yīng)加密,每5m一個(gè)。

  Construction measurement is a crucial part of road construction technology, and the accuracy of construction measurement directly affects the paving quality of the paver. We adhere to the "dual control" system, which includes two-level control by the management department and the operation team. The midpoint of the route is guided from the guide point to the bridge, culvert and other structures using precision rangefinders, and the construction leveling points are measured using third-order leveling from the guide point to the permanent telecommunication wells, bridges and other structures on the construction site. The measurement data should be calculated uniformly, and the personnel responsible for surveying, laying, surveying piers, surveying rods and steel wire ropes should be fixed. The paving elevation is controlled by dragging the sensor measuring rod on a 2mm diameter steel wire rope tied to the measuring pier or measuring rod by the paver sensor. Test piers should be spaced every 10 meters, and at smaller curve radii and super high points, they should be densified every 5 meters.

  3、封層

  3. Seal coat

  在基層上鋪筑瀝青砼面層時(shí),應(yīng)噴灑透層油。透層油可采用油水比4:6或3:7的乳化瀝青,透層油的灑布量應(yīng)控制準(zhǔn)確,多灑和少灑都不利于粘結(jié)質(zhì)量。透層油灑布前,應(yīng)在基層上先灑一遍水,待水滲入基層表面后再進(jìn)行乳化瀝青的灑布并在鋪筑瀝青砼前預(yù)留一段時(shí)間讓其自行滲入,人工撒布石屑和粗砂,用輕型壓路機(jī)滾壓一遍,在瀝青面層攤鋪前應(yīng)保證封層表面清潔無污物。

  When laying asphalt concrete surface layer on the base, a prime coat should be sprayed. The interlayer oil can be emulsified asphalt with an oil-water ratio of 4:6 or 3:7. The spraying amount of the interlayer oil should be accurately controlled, and excessive or insufficient spraying is not conducive to the bonding quality. Before spraying the prime coat, water should be sprayed on the base layer first. After the water seeps into the surface of the base layer, emulsified asphalt should be sprayed, and a period of time should be reserved for it to self infiltrate before laying the asphalt concrete. Stone chips and coarse sand should be manually spread, and a lightweight roller should be used to roll it once. Before laying the asphalt surface layer, the surface of the seal layer should be kept clean and free of dirt.

  4、拌和

  4. Mixing

  在拌和時(shí)應(yīng)嚴(yán)格控制瀝青及各種礦料的用量及拌和溫度,拌和站拌制的混合料應(yīng)均勻一致,無花白料、無結(jié)團(tuán)成塊或粗細(xì)骨料分離現(xiàn)象,不符合要求時(shí)不得使用,并應(yīng)及時(shí)調(diào)整。

  During mixing, the dosage and mixing temperature of asphalt and various mineral materials should be strictly controlled. The mixture mixed at the mixing station should be uniform, without any white material, clumping or separation of coarse and fine aggregates. If it does not meet the requirements, it should not be used and should be adjusted in a timely manner.

  5、瀝青砼運(yùn)輸

  5. Asphalt concrete transportation

  運(yùn)輸瀝青砼的車輛應(yīng)事先在車斗上刷機(jī)油以防瀝青粘結(jié),涂刷機(jī)油最好采用噴霧器,以便噴撒均勻。運(yùn)輸車上應(yīng)備有苫布以防運(yùn)輸途中遇雨和氣溫較低時(shí)瀝青散熱太快,瀝青的運(yùn)輸時(shí)間不宜超過一個(gè)小時(shí),否則會(huì)因溫度損失太多而影響瀝青砼的施工質(zhì)量。

  Vehicles transporting asphalt concrete shall brush engine oil on the vehicle body in advance to prevent asphalt adhesion. It is better to use spray to brush engine oil so as to spray evenly. Transport vehicles should be equipped with tarpaulins to prevent rapid heat dissipation of asphalt during transportation in case of rain and low temperatures. The transportation time of asphalt should not exceed one hour, otherwise it will affect the construction quality of asphalt concrete due to excessive temperature loss.

  6、瀝青砼攤鋪

  6. Asphalt concrete paving

  瀝青砼的攤鋪是路面施工的關(guān)鍵工序之一。攤鋪工藝為:攤鋪機(jī)就位→運(yùn)料車卸料→螺旋輸送器送料→熨平板加熱整平→壓路機(jī)壓實(shí)。

  The paving of asphalt concrete is one of the key processes in road construction. The paving process is as follows: the paver is in place → the material truck unloads the material → the screw conveyor feeds the material → the ironing plate is heated and leveled → the roller compacts.

  攤鋪機(jī)就位應(yīng)以測(cè)量標(biāo)高為準(zhǔn),將熨平板用薄木板墊起,調(diào)整到合適的高度。運(yùn)料車應(yīng)停在距攤鋪機(jī)料斗前約30~50cm處,用手閘制動(dòng)后,由攤鋪機(jī)向前頂住汽車后輪并向前移動(dòng)時(shí)開始起斗卸料,運(yùn)料車沖撞攤鋪機(jī),將使攤鋪機(jī)向后移動(dòng)而造成攤鋪完的瀝青砼起拱,破壞路面的平整度。如果將瀝青砼卸出攤鋪機(jī)料斗,散落在攤鋪面上,即使清理干凈,落入攤鋪機(jī)履帶下的石子也會(huì)將攤鋪機(jī)墊起而影響攤鋪平整度。

  The placement of the paver should be based on the measured elevation, and the ironing board should be supported with thin wooden boards and adjusted to the appropriate height. The material transport vehicle should be parked about 30-50cm in front of the hopper of the paver. After braking with the handbrake, the paver should push forward against the rear wheel of the vehicle and move forward to start unloading. If the material transport vehicle collides with the paver, it will cause the paver to move backward, resulting in the arching of the asphalt concrete after paving and damaging the smoothness of the road surface. If asphalt concrete is unloaded from the hopper of the paver and scattered on the paving surface, even if it is cleaned up, the stones falling under the paver tracks will still cushion the paver and affect the smoothness of the paving.

  因此,任何倒車時(shí)沖撞攤鋪機(jī)頂桿和不拉手閘就卸料而把瀝青砼卸在攤鋪機(jī)前的情況,都應(yīng)被認(rèn)為是運(yùn)輸司機(jī)的重大失誤。運(yùn)料車卸料后,攤鋪機(jī)的螺旋輸送器向兩側(cè)輸料,攤鋪機(jī)開始向前運(yùn)行。

  Therefore, any situation where the asphalt concrete is unloaded in front of the paver by colliding with the top pole of the paver during reverse and unloading without pulling the brake handle should be considered a major mistake by the transport driver. After the material truck unloads the material, the spiral conveyor of the paver transports the material to both sides, and the paver begins to move forward.

  這時(shí)應(yīng)特別注意兩側(cè)的限料器和傳感器,以免出現(xiàn)輸料過量和傳感器從鋼絲上滑落的情況。瀝青混合料經(jīng)熨平板加熱整平后,用壓路機(jī)。攤鋪機(jī)的攤鋪速度也是影響攤鋪質(zhì)量的一個(gè)因素,攤鋪速度過快,不但運(yùn)輸車輛跟不上,壓路機(jī)的工作也不能滿足要求。根據(jù)經(jīng)驗(yàn),攤鋪速度以3~4m/分鐘為宜。攤鋪機(jī)運(yùn)行過程中應(yīng)盡量避免停機(jī),攤鋪機(jī)前應(yīng)有足夠的運(yùn)輸車輛,最好有三輛裝滿瀝青砼的重車。

  At this time, special attention should be paid to the limiters and sensors on both sides to avoid excessive feeding and sensor slipping off the steel wire. After heating and leveling the asphalt mixture with an ironing board, use a roller. The paving speed of the paver is also a factor that affects the quality of paving. If the paving speed is too fast, not only can the transport vehicles not keep up, but the work of the roller cannot meet the requirements. Based on experience, a paving speed of 3-4 meters per minute is recommended. During the operation of the paver, it should be avoided to stop as much as possible. There should be sufficient transport vehicles in front of the paver, preferably three heavy vehicles filled with asphalt concrete.

  7、瀝青砼碾壓

  7. Asphalt concrete compaction

  瀝青砼碾壓是黑色路面成活的最后一道工序。由于受大氣溫度、壓路機(jī)性能、瀝青砼混合料的性能、路面厚度等諸多因素的影響,碾壓工藝也隨之變化,碾壓方法,碾壓遍數(shù)都隨之而變化。

  Asphalt concrete compaction is the final process for the survival of black road surfaces. Due to the influence of various factors such as atmospheric temperature, roller performance, asphalt concrete mixture performance, and pavement thickness, the rolling process, rolling method, and number of passes also change accordingly.

  當(dāng)瀝青混合料攤鋪一定厚度后,進(jìn)行初壓,因?yàn)榇藭r(shí)混合料溫度較高,因此采用輕型壓路機(jī),慢速、均勻碾壓2遍。

  After the asphalt mixture is spread to a certain thickness, initial compaction is carried out. As the temperature of the mixture is high at this time, a lightweight roller is used to roll it slowly and evenly twice.

  初壓時(shí)應(yīng)檢查平整度、路拱,初壓后應(yīng)采用重型機(jī)進(jìn)行復(fù)壓,碾壓遍數(shù)應(yīng)根據(jù)實(shí)驗(yàn)段確定的遍數(shù)碾壓達(dá)到要求的密實(shí)度,表面無明顯輪跡。碾壓時(shí)壓路機(jī)應(yīng)由路邊壓向路中,輪跡重疊應(yīng)滿足規(guī)范要求。

  During the initial compaction, the flatness and road arch should be checked. After the initial compaction, a heavy-duty machine should be used for re compaction. The number of compaction passes should be determined according to the experimental section to achieve the required density, and there should be no obvious wheel marks on the surface. When rolling, the roller should press from the roadside towards the center of the road, and the overlapping wheel tracks should meet the requirements of the specifications.

  不得在新鋪瀝青混合料上轉(zhuǎn)向、調(diào)頭,碾壓速度應(yīng)符合規(guī)范中的要求。在復(fù)壓后應(yīng)進(jìn)行終壓,用鋼筒式壓路機(jī)碾壓2遍,使平整度達(dá)到優(yōu)良。

  Do not turn or turn on newly laid asphalt mixture, and the rolling speed should meet the requirements in the specifications. After re compaction, final compaction should be carried out by rolling twice with a steel drum roller to achieve excellent flatness.

  8、接頭縫處理

  8. Joint seam treatment

  當(dāng)瀝青路面鋪筑結(jié)縫時(shí),可在已壓好的部分上鋪設(shè)一些熱混合料使之預(yù)熱軟化,以加強(qiáng)新舊混合料的粘結(jié)。但在開始碾壓前應(yīng)將預(yù)熱用的混合料鏟除,結(jié)縫應(yīng)做到緊密粘結(jié),充分壓實(shí)、連接平順。結(jié)縫處應(yīng)清掃干凈、切齊、邊緣涂粘層瀝青。

  When laying joints on asphalt pavement, some hot mixture can be laid on the already pressed part to preheat and soften it, in order to strengthen the bond between the new and old mixture. But before starting the rolling process, the preheating mixture should be removed, and the joints should be tightly bonded, fully compacted, and smoothly connected. The joints should be cleaned and cut neatly, and the edges should be coated with a layer of adhesive asphalt.

  本文由  瀝青料 友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://www.tainorosa.com/   真誠的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from asphalt materials For more related knowledge, please click http://www.tainorosa.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

  • 上一條:濟(jì)南瀝青混凝土配合比設(shè)計(jì)及優(yōu)化指南
  • 下一條:
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    伊人狠狠碰-BD超清在线观看 jlzzzjlzzz国产免费观看-骑马子影院-凹凸熟女精品93 | 高h日韩-伊人成人22-七区无码-gogogo高清在线完整怎么开 | 欧美日韩中文国产一区-自拍偷拍高清-极品校花自慰全过程-狠狠干清纯美女 | 丰满美女自慰胸又大又黄网站-日韩欧美aⅴ综合网站发布-深夜无码一区二区三区-国产蜜臀av在线一区浪潮 | 好爽又高潮了毛片免费下载-森泽佳奈善良的人妻-高清韩国电影在线观看-曰本人久久久久久 | 女人18毛片a级久久18-日本人XXX亚洲人-69久久精品无码一区二区-高清一级做?爱视频免费 | 国产女同闺蜜在线播放-中文字幕无码一区二区免费-操日本妓女-极品美女操 | 高跟鞋高跟XXXXHDvideos-黄片基地-青青伊人国产-淫妻网址 | 久久伊人演绎-北条麻妃欧美图片-蜜臀北条麻妃中文人妻-特级西西人体444是什么意思 | 了解最新有码无码人妻系列专区信息!-狠狠尻加勒比美女视频-人妻出差被黑人上司侵犯-亚洲国产午夜精华无码福利资讯 | 性高湖久久久久久久久91免费看-俄罗斯胖女人BWBW-好男人www免费高清视频在线-我和岳肉伦淫史 | 白胖老肥熟女A片免费播放-各种流量变现加飞机@NN131455-女人A级毛片19毛水真多-中文字幕穴触手 | 久久动漫尤物视频-少妇高潮zzzzzzzyⅹ脱出-HD免费观看最新 免费大片av手机看片高清-热久久99这里有综合久久 | 口述久久中出-欧美辣图综合网站-特级毛片中国女富婆-av加勒比地狱 | 国内乱轮视频-人人摸人人操-中文字幕在线123-亚洲美女玉足激情在线 | 亚州av色-日本一本免费一区二区三区久久无码综合-极品人妖高潮汇编-台湾少妇XX性生话 | 昭和军人侵犯妇女电影在线看-1080高清迅雷在线观看 一级黄色片网站-日本强伦姧人妻一区二区 精品国产第一国产综合精品-思思99re视频在线观看 | 黑人大战白妞高潮喷白浆-BD韩语高清在线观看 天天操夜夜骑-成人无码一区二区www-极品人妖ts自慰网站 | 熟女人妻四十路五十路-BD国语神马影院手机在线 2159 4293 亚洲精品国产精品国自产99. -97c女优在线-女人与公牛高潮毛片 | 亚洲裸体杂技-国内精品久久无码人妻影院-人妻丝袜500-国产免费久久精品久久久 | 蓝光电影在线观看 漂亮人妻被夫上司强了波多野结衣-大美女靠逼免费-色欲插插-剧情片在线视频观看 国产99在线播放免费 | 狂操黑丝美女-zzji亚洲日本少妇jizjⅰz-操熟女91-蓝光在线观看电视 亚洲ⅴa在线va天堂va | 米仓穂香中文精品无码-DVD视频大全 久久久久久精品成人免费-jlzz大全高潮多水老师国产-中文字幕免费在线看线人动作大片 亚洲成人手机在线 | 黑人巨大解禁波多野-1080手机在线观看 島國av女優大片-大黑逼人妻网-偷拍50个妇女洗澡 | 精品福利导航-老色驴综合网-久草视频免费在线播放-金发女郎自慰,Kanger Linn Karter揉她的骚逼 【我有一台拖拉机】,顶级高端外围场 | 裸体美女黄片-国产chinese男男网站玄兵-人妻初次体现黑人中文字幕-波多野结衣中文字幕青青草一区 | 中文字幕第一二三四区-客厅引诱H啊H嗯H公-早川濑里奈与黑人FUCK在线-国产性色hd | 自拍偷拍视频网站-性高湖久久久久久久久aaaaa 性欧美乱妇高清come-性少妇bww-亚洲国产日韩电影艳情三级片激情视频系列 | www.wuye.com-蜜桃xxxxx18欧美-美女嘿嘿嘿免费在线-毛多色婷婷 | 91北条麻妃在线-2024影音先锋最新女人午夜资源-亚洲人成电影在线播放-人与嘼交av免费网站 | 韩国Koreanbj福利一区二区-台湾佬中文网zzzzzz-国产亚洲玖玖玖在线观看-北条麻妃人妻丝袜办公室 国产裸体按摩视频-gay一区-中国老熟女重囗味HDXX第一次-日本精品视频在线观看一区二区 | ZZⅰjZZ国产-老妇女m大香蕉视频sBs-免费看捆绑女人毛片-捆绑1234av | 女学生被调教A片-北条麻妃大乱交-重囗味sM群虐一区二区-少妇老师浪荡H肉辣文 | 人人操东京热-北条麻妃中文字幕-大桥未久黑人mibd154在线-天天躁夜夜躁狠狠躁裸体八戒影视 | 国产一级午夜一级三区欧洲k8播-小情侣嗯啊哦视频WWW-新女人另类ZZZ000HD-污污肉文 | 国产精品盗摄偷窥盗摄-观看影视服务! 成a人片在线观看视频-亚洲AV一区二区在线紧身裙教师-学长,想让我给你口吗? - 第一人称视角 素人少女 Reislin “我好欠干,哥哥能来一起干我吗,我给你舔鸡巴” | nnys牛牛嫩草牛老太国产久久精品-狼人狠狠干-BD英语电影完整版 国产在线精品国自产拍-国产猛男猛女超爽免费视频 | 女同囗交 荫蒂-精品国产92一区二区三区-小倩有码视频-日韩嘿咻在线 | A级片一级片-久久真实偷拍九九-青青女色欧美-日韩插插插 | 巨乳美女自慰-免费三级在线观看中文字幕-超清电影全集观看 国产麻豆Av一区二区三区夏竹-色噜噜狠狠狠狠色综合久一 | 非洲黑人一区二区淫乱-4hu国产在线-4hu永久-清纯粉嫩美女抠逼喷白浆自慰网站 |