濟南水穩(wěn)攪拌站:水泥穩(wěn)定碎石基層施工

來源:http://www.tainorosa.com/ 日期:2025-10-25

  1、工藝流程

  1. Process flow

  施工放樣→準備下承層→拌和→運輸→攤鋪→初壓→標高復測→補整→終壓→養(yǎng)生

  Construction layout → preparation of sub layer → mixing → transportation → paving → initial compaction → elevation re measurement → finishing → final compaction → curing圖10

 ?。?)測量放樣

  (1) Measurement and layout

  按20m一個斷面恢復道路中心樁、邊樁,并在樁上標出基層的松鋪高程和設計高程。

  Restore the center and side stakes of the road in sections of 20m, and mark the loose laying elevation and design elevation of the base layer on the stakes.

  (2)準備下承層

  (2) Prepare the lower layer

  下基層施工前,對路基進行清掃,然后用振動壓路機碾壓三至四遍,如發(fā)現(xiàn)土過干、表面松散,適當灑水;如土過濕,發(fā)生彈簧現(xiàn)象,采取開窗換填砂礫的辦法處理。上基層施工前,對下基層進行清掃,并灑水濕潤。

  Before the construction of the subgrade, the roadbed should be cleaned and then compacted three to four times with a vibratory roller. If the soil is found to be too dry or the surface is loose, appropriate watering should be applied; If the soil is too wet and spring phenomenon occurs, the method of opening windows and replacing with gravel should be taken to deal with it. Before the construction of the upper base layer, clean the lower base layer and sprinkle water to keep it moist.

 ?。?)拌和

  (3) Mixing

  穩(wěn)定料的拌和場設在砂石場,拌和設備采用6臺500L的單軸式強制攪拌機和一臺基層料集中廠拌機。料場內(nèi)的砂、石分區(qū)堆放,并設有電子自動計量設備和地磅,在每天開始拌和前,按配合比要求對水泥、集料的用量準確調(diào)試,告別特別是根據(jù)天氣變化情況,測定集料的自然含水量,以調(diào)整拌和用水量。拌和時確保足夠的拌和時間,使穩(wěn)定料拌和均勻。

  The stable material mixing plant is located in the sand and gravel yard, and the mixing equipment includes six 500L single axis forced mixers and one base material centralized plant mixer. The sand and stone in the material yard are stacked in different zones and equipped with electronic automatic measuring equipment and weighing scales. Before starting mixing every day, the amount of cement and aggregate is accurately adjusted according to the mixing ratio requirements. Especially based on weather changes, the natural moisture content of the aggregate is measured to adjust the mixing and water consumption. Ensure sufficient mixing time during mixing to ensure even mixing of stable materials.

 ?。?)運輸

  (4) Transportation

  施工時配備足夠的運輸車輛,并保持道路暢通,使穩(wěn)定料盡快運至攤鋪現(xiàn)場。炎熱天氣運輸時加彩條布遮蓋,防止水份過度蒸發(fā)。

  During construction, sufficient transportation vehicles should be equipped and the roads should be kept clear to ensure that stable materials are transported to the paving site as quickly as possible. Cover with colored cloth during transportation in hot weather to prevent excessive evaporation of moisture.

 ?。?)攤鋪

  (5) Spread out

  機動車道基層采用攤鋪機施工,非機動車道基層采用人工攤鋪。攤鋪時嚴格控制好松鋪系數(shù),人工實時對缺料區(qū)域進行補整和修邊。

  The base layer of the motor vehicle lane is constructed using a paver, while the base layer of the non motor vehicle lane is paved manually. Strictly control the loose paving coefficient during paving, and manually adjust and trim the missing material areas in real time.

 ?。?)壓實

  (6) Compaction

  攤鋪一小段后(時間不超過3小時),用18T的振動壓路機靜壓兩遍、振壓一遍后暫時停止碾壓,測量人員立即進行高程測量復核,將標高比設計高超過1cm,或低0.5cm的部位立即進行找補,完畢后用壓路機進行振動碾壓。碾壓時由邊至中,由低至高,由弱至強、重疊1/3輪寬的原則碾壓,在規(guī)定的時間內(nèi)(不超過四小時)碾壓到設計壓實度,并無明顯輪跡時為止。碾壓時,嚴禁壓路機在基層上調(diào)頭或起步時速度過大,碾壓時輪胎朝正在攤鋪的方向。

  After paving for a short period of time (not exceeding 3 hours), use an 18T vibratory roller to perform static pressure twice and temporarily stop rolling after one vibration. The measuring personnel immediately conduct elevation measurement review, and immediately make up for the parts that are more than 1cm higher or 0.5cm lower than the design elevation. After completion, use a roller to perform vibratory rolling. When rolling, follow the principle of rolling from edge to center, from low to high, from weak to strong, and overlapping by 1/3 of the wheel width. Within the specified time (not exceeding four hours), roll until the designed compaction degree is reached and there are no obvious wheel marks. When rolling, it is strictly prohibited for the roller to turn around or start at too high a speed on the base, and the tires should face the direction of the paving during rolling.

 ?。?)養(yǎng)生

  (7) Health Preservation

  穩(wěn)定料碾壓后四小時內(nèi),用經(jīng)水浸泡透的麻袋嚴密覆蓋進行養(yǎng)護,八小時后再用自來水澆灌養(yǎng)護七天以上,并始終保持麻袋濕潤。穩(wěn)定料終凝之前,嚴禁用水直接沖刷基層表面,避免表面浮砂損壞。

  Within four hours after the stable material is compacted, it should be tightly covered with water soaked burlap bags for curing. After eight hours, it should be watered with tap water for curing for more than seven days, and the burlap bags should be kept moist at all times. Before the final solidification of the stable material, it is strictly prohibited to directly flush the surface of the base layer with water to avoid surface floating sand damage.

 ?。?)試驗

  (8) Experiment

  混合料送至現(xiàn)場半小時內(nèi),在監(jiān)理的監(jiān)督下,抽取一部分送到業(yè)主指定或認可的試驗室,進行無側(cè)限抗壓強度和水泥劑量試驗。壓實度試驗一般采用灌砂法,在碾壓后12小時內(nèi)進行,避免時間過長基層終凝后增大勞動強度,試驗后的洞眼用C10砼進行補平。彎沉試驗在施工七天后進行。

  Within half an hour of delivering the mixture to the site, under the supervision of the supervisor, a portion shall be selected and sent to a laboratory designated or approved by the owner for unconfined compressive strength and cement dosage testing. The compaction test is generally conducted using the sand filling method within 12 hours after rolling to avoid increasing labor intensity after the final setting of the base layer. The holes after the test are filled with C10 concrete. The deflection test shall be conducted seven days after construction.

 ?。?)伸縮縫

  (9) Expansion joint

  為防止基層因伸縮開裂而影響路面結(jié)構(gòu),施工時按每15m設一條橫向伸縮縫,做法是:按位置通長斷面埋設高為7cm,厚0.5cm的九夾板。路面施工前沿伸縮縫涂一層瀝青,再在上鋪上無紡土工布,寬度為1m。伸縮縫設置時,必須保證全斷面貫通,嚴禁車道之間錯位。

  To prevent the pavement structure from being affected by expansion and cracking of the base layer, a transverse expansion joint shall be set every 15m during construction. The method is to embed a 7cm high and 0.5cm thick nine piece clamp plate along the entire section of the position. Apply a layer of asphalt to the expansion joint at the forefront of road construction, and then lay non-woven geotextile on top with a width of 1m. When setting up the expansion joint, it must be ensured that the entire section is connected, and it is strictly prohibited to deviate between lanes.

 ?。?0)施工縫

  (10) Construction joints

  在每段基層施工結(jié)束處,安放一條橫貫全寬與壓實后厚度等高的木方,木方一側(cè)穩(wěn)定料充滿至松鋪高度,另一側(cè)用素土回填穩(wěn)定至木方高度,然后碾壓成型,待下段施工段施工前,再移走木方及素土,并按伸縮縫的辦法處理。

  At the end of each section of base construction, place a wooden block that spans the full width and compacted thickness to the same height. Fill one side of the wooden block with stable material until it reaches the height of the loose paving, and backfill the other side with plain soil to stabilize it until it reaches the height of the wooden block. Then roll it into shape. Before the construction of the next section, remove the wooden block and plain soil, and treat it as an expansion joint.

 ?。?1)縱縫

  (11) Longitudinal seam

  機動車道中心線處的縱縫,在每段施工段施工完畢后12小時內(nèi),人工將該側(cè)的基層邊坡鑿成垂直形狀,另幅施工時,接觸面上濕潤后刷水泥漿。

  The longitudinal joint at the centerline of the motor vehicle lane shall be manually chiseled into a vertical shape on the side of the base slope within 12 hours after the completion of each construction section. During the construction of another section, the contact surface shall be moistened and then coated with cement slurry.

  2、質(zhì)量標準

  2. Quality standards

 ?。?)機動車道壓實度≥98%;7d齡期無側(cè)限抗壓強度上層3.5-4Mpa,下層3-3.5Mpa;底基層為2.5 Mpa。

  (1) The compaction degree of the motor vehicle lane is ≥ 98%; The upper layer has an unconfined compressive strength of 3.5-4Mpa and the lower layer has an unconfined compressive strength of 3-3.5Mpa at a 7-day age; The base layer is 2.5 Mpa.

 ?。?)非機動車道壓實度≥97%;7d齡期無側(cè)限抗壓強度達到3.0-3.5 Mpa。

  (2) The compaction degree of non motorized vehicle lanes is ≥ 97%; The unconfined compressive strength at 7-day age reaches 3.0-3.5 Mpa.

 ?。?)水泥用量一般為3%-5.5%,當達不到強度要求時,水泥的最大劑量不應超過6%,底基層的水泥計量一般為3%。

  (3) The cement dosage is generally 3% -5.5%. When the strength requirements are not met, the maximum cement dosage should not exceed 6%. The cement dosage for the base layer is generally 3%.

  3、對水泥穩(wěn)定砂礫(碎石)的材料要求

  3. Material requirements for cement stabilized gravel (crushed stone)

 ?。?)砂礫(碎石):集料最大粒徑不應超過30mm,集料的壓碎值不應大于20%,硅酸鹽含量不宜超過0.25%。

  (1) Gravel (crushed stone): The maximum particle size of aggregate should not exceed 30mm, the crushing value of aggregate should not exceed 20%, and the silicate content should not exceed 0.25%.

  (2)水泥:采用普通硅酸鹽水泥,礦渣硅酸鹽水泥,標號為425#。

  (2) Cement: Ordinary Portland cement and slag Portland cement are used, with a grade of 425 #.

  4、配合比設計

  4. Mix proportion design

 ?。?)一般規(guī)定

  (1) General provisions

 ?、偎喾€(wěn)定砂礫(碎石)混合料的組成設計包括:根據(jù)水泥穩(wěn)定碎石的強度標準,確定必須的水泥劑量和混合料的最佳含水量,在需要改善土的顆粒組成時,還包括摻加料的比例。

 ?、?The composition design of cement stabilized gravel (crushed stone) mixture includes determining the necessary cement dosage and optimal moisture content of the mixture based on the strength standards of cement stabilized gravel. When improving the particle composition of soil, it also includes the proportion of additives.

 ?、谒喾€(wěn)定砂礫(碎石)的各項試驗,應按JTJ057-94的有關規(guī)定進行。

  ② The various tests for cement stabilized gravel (crushed stone) should be conducted in accordance with the relevant provisions of JTJ057-94.

 ?。?)原材料試驗

  (2) Raw material testing

 ?、僭谒喾€(wěn)定砂礫(碎石)施工前,進行下列試驗:a.顆粒分析b.液限和塑性指數(shù)c.相對密度d.重型擊實試驗e.砂礫(碎石)的壓碎值試驗f.有機質(zhì)含量(必要時做)g.硫酸鹽含量(必要時做)

 ?、?Before the construction of cement stabilized gravel (crushed stone), the following tests shall be conducted: a. Particle analysis b. Liquid limit and plasticity index c. Relative density d. Heavy compaction test e. Crushing value test of gravel (crushed stone) f. Organic matter content (if necessary) g. Sulfate content (if necessary)

 ?、跈z測水泥的標號及初凝、終凝時間。

 ?、?Test the grade and initial and final setting time of cement.

  本文由 濟南水穩(wěn)攪拌站  友情奉獻.更多有關的知識請點擊  http://www.tainorosa.com/   真誠的態(tài)度.為您提供為全面的服務.更多有關的知識我們將會陸續(xù)向大家奉獻.敬請期待.

  This article is a friendly contribution from Jinan Water Stable Mixing Plant For more related knowledge, please click http://www.tainorosa.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

  • 上一條:濟南壓路機租賃:設備安全操作規(guī)程
  • 下一條:濟南挖掘機租賃:設備的一級保養(yǎng)和二級保養(yǎng)
  • 相關產(chǎn)品:

    相關新聞:

    美女自卫黄网站-内射黑丝少妇-国产亚洲精品久久久久动-欧美 宗合 欧美 视频 | h视频网站水逼白嫩-台湾性色情XXⅩXX-蜜桃17c成人-东北女人挨操 日本特黄a级视频 日本在线观看永久免费网站-三p被狂躁到高潮失禁电影-无码人妻AⅤ一区二区三区A片一三级高清无码-久久综合九色综合欧美播 | 99re6这里有精品热视频 国产成人午夜精品一区二区三区-嗯~用力啊~嗯~c我~白洁小说-国产第1页-高清韩国电影在线观看 中文字幕?9?2?1?5一区二区人妻 | jizz毛茸茸-成人午夜a片一区二区三区-亚洲国产精品无码久久久久久曰-九色九一 | 国产盗摄性综合-妺妺窝人体色88888美女吗-午夜成人短视频-国产亚洲欧美日韩不卡18 | 亚洲欧美日韩中文综合v日本-亚洲黑丝4K超高清顶级美女少妇午夜999-艳妇淫乐园-国产熟妇茂密黑森林 | DVD原版全集在线观看播放 国产****毛片菲菲-日日狠狠久久偷偷色综合96蜜桃-艹逼91-无码专区wwww 亚洲中文字幕乱码一区二区三区-美女狠狠狠-国产精品亚洲一区二区无码麻店-久久精品亚洲成在人线aⅴ麻豆 | 妃光莉在线播放69Av-国产精品视频一区二区三区-91精品啪在线观看国产60岁-天堂V7 | 欧美呦呦在线高考-90集免费观看 无码精品国产第1页-女子极淫视频-色悠悠官方网址 | 五月黑人精品-国产又色又爽又黄刺激的视频-日日草 视频-美女裸体自慰麻豆蜜桃 | 黑人巨大マラ北条麻妃-jizz精品-中国猛男玩大粗鳮巴-91探花偷偷拔套在线播放 | ZZⅰjZZ国产-老妇女m大香蕉视频sBs-免费看捆绑女人毛片-捆绑1234av | 国产成人电影在线观看-BD国语韩国电影在线观看 久久久久精品无码**一区二区三区-瑜伽yin荡邻居人妻-美女自慰免费看 | 自拍偷拍视频网站-性高湖久久久久久久久aaaaa 性欧美乱妇高清come-性少妇bww-亚洲国产日韩电影艳情三级片激情视频系列 | 欧美黄色tv-www妞妞一区-国产在线精品一区二区夜色-四十路G五十路熟女豊满AV | MM美女亚欧视频免费观看-高傲仙子丝袜美腿呻吟-91jiujiuse-国产在线视精品在亚洲 | 少妇搡BB搡BBBB搡B毛片-女子自慰喷水freesexpornAV免费观看-白丝老师自慰出水欧美精选-就去操穴网 | x88AV~熟女人妻-医生强烈婬药h调教小说视频-六十路熟女交尾中出-绝顶高潮videos合集 | 欧美9 6区-黄色电影网址 翔田千里-中国肥白老熟妇露脸1-91插插 | 免费a级毛片 精品国产欧美一区二区三区成人-森泽佳奈久久久久-www.四虎884AA.com-国产美女永远免 | 综合网pacopacomama-红桃视频 亚洲 长长久久的爱在线观看-伊人青涩网-城中村站街老妇女BBWASS | 91搞鸡电影-无翼鸟高辣高hh高辣-精品无码国模私拍自拍视频-jizz网站 | 日韩无毛美女中出-真实国产乱子伦对白视频37p 国产美女作爱-樱桃熟了A级毛片-成人午夜福利院在线观看日韩欧美视频免费观看 | 美剧网,手机电影网最新高清电影电视剧、综艺、美剧、韩剧、英剧、日剧等迅雷下载-色射婷婷-freesexvideos高潮xxxxx-亚洲精品一卡2卡3卡四卡乱码 | gogogo免费完整高清手机观看-午夜不卡欧美aaaaaa在线观看-土匪av在线-中文字幕第一区 | 后入大屁股熟女-久久女色网男同志-国产涩涩-国产三a级三级日产三级野外 | 大荫蒂XX另类老妇作爱-91黑人精品一区二区三区-www.japansex.con-国产日韩视频在线播放 | 色资源av中文无码先锋-久久人人爽人人爽人人av东京热-国产超碰av无码一区二区-亚洲人午夜射精精品日韩 | 日韩欧美亚洲中文字幕-BD在线播放观看 2018国产大陆天天弄a-精品免费囯产一区二区三区四区免费观影-双性人妖A片无码专区 | 内射人妻aaa-在线重口av-今天高清视频在线观看华中影院-日本亚洲中文字幕不卡 | 91青青青国产在线观看机-免费观看黄色视频网站-亚洲无码久久久久久久瑜伽-91淫妻在线观看 | 免费看待黄国产孕妇片-多毛的亚洲人毛茸茸-北条麻妃高潮-高跟鞋肉丝交足91 | 瑟瑟五月天-美国XXXXXXXXX98-嘼皇videos最新欧美另类-BD韩语手机在线看 | 台湾佬一区二区三区-亚洲1页-yjzz国产在线-黑人精品一区二区在线播放 | 日韩福利片午夜在线观看-一乃葵在线-艳妇系列短篇500肥岳-九九九综合视频 | 色妇视频在线观看-国产东北女人内谢ⅩXX-gogogo高清在线观看免费完整版-日本人试爱 | 女同性毛片-风间优美的一级中文视频-国产一级二级三级视频-雅嫩H女娃H粗大乱 | 美女自卫黄网站-内射黑丝少妇-国产亚洲精品久久久久动-欧美 宗合 欧美 视频 | 一几黄色片按摩-极品少妇av-成人AV-久久天天干妻-草草影院小姐姐-成人午夜性a一级毛片免费一级黄色毛片 | jizz毛茸茸-成人午夜a片一区二区三区-亚洲国产精品无码久久久久久曰-九色九一 | xxxxx 黄色-欲求不满小早川玲子-老头乐AV导航-四虎影视老肥熟 |